<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>PM Test Center &#187; cost</title>
	<atom:link href="http://pmtestcenter.com/category/knowledge-area/cost/feed" rel="self" type="application/rss+xml" />
	<link>http://pmtestcenter.com</link>
	<description>FREE daily project management test questions for PMP®, CAPM®, and Project+ exams!</description>
	<lastBuildDate>Fri, 10 Feb 2012 05:01:00 +0000</lastBuildDate>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.3.1</generator>
		<item>
		<title>Estimating type that takes the least amount of time</title>
		<link>http://pmtestcenter.com/estimating-type-that-takes-the-least-amount-of-time?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=estimating-type-that-takes-the-least-amount-of-time</link>
		<comments>http://pmtestcenter.com/estimating-type-that-takes-the-least-amount-of-time#comments</comments>
		<pubDate>Thu, 09 Feb 2012 05:01:02 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[estimating]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=803</guid>
		<description><![CDATA[Which of the following estimating types takes the least amount of time to prepare?

A. Analogous
B. Parametric
C. Engineering
D. Bottom up

Answer: B. Parametric
Parametric, also known as rough order of magnitude, is very quick since it is simply estimating a part of the project and scaling it. For instance, if it is estimated to take 8 hours and $1000 to do paint a room, then the estimate for painting eight rooms of similar size would take 64 hours and $8000.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>Which of the following estimating types takes the least amount of time to prepare?</p>
<p>A. Analogous<br />
B. Parametric<br />
C. Engineering<br />
D. Bottom up</p>
<input type="button" value="Click to see answer" onClick='alert("B. Parametric -- Parametric, also known as rough order of magnitude, is very quick since it is simply estimating a part of the project and scaling it. For instance, if it is estimated to take 8 hours and $1000 to do paint a room, then the estimate for painting eight rooms of similar size would take 64 hours and $8000.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-803"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/estimating-type-that-takes-the-least-amount-of-time/feed</wfw:commentRss>
		<slash:comments>3</slash:comments>
		</item>
		<item>
		<title>How much the project is expected to cost at completion</title>
		<link>http://pmtestcenter.com/how-much-the-project-is-expected-to-cost-at-completion?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=how-much-the-project-is-expected-to-cost-at-completion</link>
		<comments>http://pmtestcenter.com/how-much-the-project-is-expected-to-cost-at-completion#comments</comments>
		<pubDate>Tue, 07 Feb 2012 05:01:29 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[monitoring and controlling]]></category>
		<category><![CDATA[earned value]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=789</guid>
		<description><![CDATA[You are halfway through your project and your sponsor would like to know how much the project is expected to cost when it is completed. What earned value metric should you use?

A. CV
B. AC
C. EAC
D. ETC

Answer: C. EAC
EAC (Estimate at Completion) tells you that the project is expected to cost x dollars. This is derived from how much you thought it would cost from the beginning (BAC) and what the rate of spending is (CPI).]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>You are halfway through your project and your sponsor would like to know how much the project is expected to cost when it is completed. What earned value metric should you use?</p>
<p>A. CV<br />
B. AC<br />
C. EAC<br />
D. ETC</p>
<input type="button" value="Click to see answer" onClick='alert("C. EAC -- EAC (Estimate at Completion) tells you that the project is expected to cost x dollars. This is derived from how much you thought it would cost from the beginning (BAC) and what the rate of spending is (CPI).")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-789"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/how-much-the-project-is-expected-to-cost-at-completion/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Sunk costs</title>
		<link>http://pmtestcenter.com/sunk-costs?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=sunk-costs</link>
		<comments>http://pmtestcenter.com/sunk-costs#comments</comments>
		<pubDate>Sat, 14 Jan 2012 05:01:52 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[initiating]]></category>
		<category><![CDATA[planning]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=671</guid>
		<description><![CDATA[Your company is in the process of deciding whether to continue with Project A or terminate it and begin Project B instead. You have already invested 12 months and $100,000 on Project A. It will take another 24 months and $50,000 to complete it. Project B is actually a better solution since the end product will result in a greater long-term savings. However, it will take 18 months and $250,000 to complete. Additionally, all time and money spent on Project A already would be wasted. Which project should the company chose?

A. Project A because the company has already spent 12 months and $100,000
B. Project A because it is still more inexpensive than Project B
C. Project B because time and money spent on Project A is irrelevant to the decision
D. Project B because it can be completed in less time than Project A

Answer: C. Project B because time and money spent on Project A is irrelevant to the decision
When a decision is being made from a cost perspective, expended (or sunk) costs are ignored. The goal is to make the best decision regardless of what paths were taken prior to that point in time.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>Your company is in the process of deciding whether to continue with Project A or terminate it and begin Project B instead. You have already invested 12 months and $100,000 on Project A. It will take another 24 months and $50,000 to complete it. Project B is actually a better solution since the end product will result in a greater long-term savings. However, it will take 18 months and $250,000 to complete. Additionally, all time and money spent on Project A already would be wasted. Which project should the company chose?</p>
<p>A. Project A because the company has already spent 12 months and $100,000<br />
B. Project A because it is still more inexpensive than Project B<br />
C. Project B because time and money spent on Project A is irrelevant to the decision<br />
D. Project B because it can be completed in less time than Project A</p>
<input type="button" value="Click to see answer" onClick='alert("C. Project B because time and money spent on Project A is irrelevant to the decision -- When a decision is being made from a cost perspective, expended (or sunk) costs are ignored. The goal is to make the best decision regardless of what paths were taken prior to that point in time.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-671"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/sunk-costs/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Level resources</title>
		<link>http://pmtestcenter.com/level-resources?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=level-resources</link>
		<comments>http://pmtestcenter.com/level-resources#comments</comments>
		<pubDate>Thu, 12 Jan 2012 05:01:54 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[monitoring and controlling]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[activity sequencing]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=664</guid>
		<description><![CDATA[Resource leveling typically results in a:

A. Project cost overrun
B. Project cost savings
C. Project duration longer than the baseline
D. Project duration shorter than the baseline

Answer: C. Project duration longer than the baseline
When resource leveling, work scheduled for resources that are over-allocated will be spread over a longer period of time. As a result, this smoothing out process will usually cause the project to take longer.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>Resource leveling typically results in a:</p>
<p>A. Project cost overrun<br />
B. Project cost savings<br />
C. Project duration longer than the baseline<br />
D. Project duration shorter than the baseline</p>
<input type="button" value="Click to see answer" onClick='alert("C. Project duration longer than the baseline -- When resource leveling, work scheduled for resources that are over-allocated will be spread over a longer period of time. As a result, this smoothing out process will usually cause the project to take longer.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-664"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/level-resources/feed</wfw:commentRss>
		<slash:comments>2</slash:comments>
		</item>
		<item>
		<title>Over-allocated resources</title>
		<link>http://pmtestcenter.com/over-allocated-resources?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=over-allocated-resources</link>
		<comments>http://pmtestcenter.com/over-allocated-resources#comments</comments>
		<pubDate>Wed, 11 Jan 2012 05:01:31 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[monitoring and controlling]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[activity sequencing]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=661</guid>
		<description><![CDATA[While reviewing your weekly report, you notice that two of your resources are over-allocated. One way to solve this is to:

A. Level resources
B. Use PERT
C. Add lag
D. Crash the schedule

Answer: A. Level resources
Of the choices, only leveling resources is the only method that will relieve over-allocated resources. Leveling will take the extra work and move it to a different date so the resources will not exceed their maximum per day.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>While reviewing your weekly report, you notice that two of your resources are over-allocated. One way to solve this is to:</p>
<p>A. Level resources<br />
B. Use PERT<br />
C. Add lag<br />
D. Crash the schedule</p>
<input type="button" value="Click to see answer" onClick='alert("A. Level resources -- Of the choices, only leveling resources is the only method that will relieve over-allocated resources. Leveling will take the extra work and move it to a different date so the resources will not exceed their maximum per day.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-661"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/over-allocated-resources/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Earned value chart</title>
		<link>http://pmtestcenter.com/earned-value-chart?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=earned-value-chart</link>
		<comments>http://pmtestcenter.com/earned-value-chart#comments</comments>
		<pubDate>Wed, 04 Jan 2012 05:01:29 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[monitoring and controlling]]></category>
		<category><![CDATA[earned value]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=626</guid>
		<description><![CDATA[At your upcoming status meeting with your project sponsor, rather than just using a table, you want to graphically show earned value. Which of the following charts will you use?

A. Trend analysis
B. Control chart
C. S-curve
D. Pareto diagram

Answer: C. S-curve
An S-curve graph typically displays earned value (EV), planned value (PV) and actual cost (AC). PV is charted first and will look like an S. As time progresses, the EV and AC will extend allowing you to compare them against the PV.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>At your upcoming status meeting with your project sponsor, rather than just using a table, you want to graphically show earned value. Which of the following charts will you use?</p>
<p>A. Trend analysis<br />
B. Control chart<br />
C. S-curve<br />
D. Pareto diagram</p>
<input type="button" value="Click to see answer" onClick='alert("C. S-curve -- An S-curve graph typically displays earned value (EV), planned value (PV) and actual cost (AC). PV is charted first and will look like an S. As time progresses, the EV and AC will extend allowing you to compare them against the PV.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-626"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/earned-value-chart/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Three point estimate</title>
		<link>http://pmtestcenter.com/three-point-estimate?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=three-point-estimate</link>
		<comments>http://pmtestcenter.com/three-point-estimate#comments</comments>
		<pubDate>Mon, 02 Jan 2012 05:01:39 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[time]]></category>
		<category><![CDATA[estimating]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=609</guid>
		<description><![CDATA[While planning a project that has not been accomplished before at the company, your manager asks you to get a three point estimate from Shari, the lead designer. Shari provides you with an optimistic estimate (2 hours), a most likely estimate (4 hours), and a pessimistic estimate (12 hours). What must be the three point estimate for Shari's task?

A. 5 hours
B. 6 hours
C. 10 hours
D. Not enough information and will need clarification from the manager

Answer: D. Not enough information and will need clarification from the manager
A three point estimate could be derived several ways. Two of the most common are the mean ((O+M+P)/3), which would give you 6 hours and PERT ((O+4M+P)/6), which would give you 5 hours. However, in this example, it is not clear what type of three point estimate to use.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>While planning a project that has not been accomplished before at the company, your manager asks you to get a three point estimate from Shari, the lead designer. Shari provides you with an optimistic estimate (2 hours), a most likely estimate (4 hours), and a pessimistic estimate (12 hours). What must be the three point estimate for Shari&#8217;s task?</p>
<p>A. 5 hours<br />
B. 6 hours<br />
C. 10 hours<br />
D. Not enough information and will need clarification from the manager</p>
<input onclick="alert(&quot;D. Not enough information and will need clarification from the manager -- A three point estimate could be derived several ways. Two of the most common are the mean ((O+M+P)/3), which would give you 6 hours and PERT ((O+4M+P)/6), which would give you 5 hours. However, in this example, it is not clear what type of three point estimate to use.&quot;)" type="button" value="Click to see answer" />
<p><em>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</em></p>
<div class="shr-publisher-609"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/three-point-estimate/feed</wfw:commentRss>
		<slash:comments>6</slash:comments>
		</item>
		<item>
		<title>Cost variance and schedule variance</title>
		<link>http://pmtestcenter.com/cost-variance-and-schedule-variance?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=cost-variance-and-schedule-variance</link>
		<comments>http://pmtestcenter.com/cost-variance-and-schedule-variance#comments</comments>
		<pubDate>Thu, 22 Dec 2011 05:01:58 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[monitoring and controlling]]></category>
		<category><![CDATA[earned value]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=566</guid>
		<description><![CDATA[If a project has a Cost Variance (CV) of 1000 and a Schedule Variance (SV) of -1000, what does it mean?

A. The project is under budget and behind schedule.
B. The project is over budget and ahead of schedule.
C. It is impossible to have a negative SV.
D. The Overall Variance (OV) is 0.

Answer: A. The project is under budget and behind schedule.
For both Cost Variance (CV) and Schedule Variance (SV), if the number is positive, then it is good. Conversely, if the number is negative, then it is bad. So CV of 1000 is good (under budget), while SV of -1000 is bad (behind schedule). There is no such thing as Overall Variance (OV).]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>If a project has a Cost Variance (CV) of 1000 and a Schedule Variance (SV) of -1000, what does it mean?</p>
<p>A. The project is under budget and behind schedule.<br />
B. The project is over budget and ahead of schedule.<br />
C. It is impossible to have a negative SV.<br />
D. The Overall Variance (OV) is 0.</p>
<input type="button" value="Click to see answer" onClick='alert("A. The project is under budget and behind schedule. -- For both Cost Variance (CV) and Schedule Variance (SV), if the number is positive, then it is good. Conversely, if the number is negative, then it is bad. So CV of 1000 is good (under budget), while SV of -1000 is bad (behind schedule). There is no such thing as Overall Variance (OV).")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-566"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/cost-variance-and-schedule-variance/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Accelerated depreciation</title>
		<link>http://pmtestcenter.com/accelerated-depreciation?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=accelerated-depreciation</link>
		<comments>http://pmtestcenter.com/accelerated-depreciation#comments</comments>
		<pubDate>Sun, 18 Dec 2011 05:01:32 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[planning]]></category>
		<category><![CDATA[project selection]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=517</guid>
		<description><![CDATA[Megan is working with her finance department to determine depreciation for a warehouse forklift that was purchased. She is told that accelerated depreciation will be used. If the forklift cost $50,000 and Megan wants to spread the depreciation over five years, which of the following will the first year most likely be?

A. $5,000
B. $8,000
C. $10,000
D. $15,000

Answer: D. $15,000
If Megan was asked to use straight line depreciation, then the answer would be $10,000, which is a simple average. For accelerated depreciation, the first year will be higher than the average and incrementally decrease over time. As a result, the first year depreciation could only be $15,000 from this list since it is the only value greater than $10,000.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>Megan is working with her finance department to determine depreciation for a warehouse forklift that was purchased. She is told that accelerated depreciation will be used. If the forklift cost $50,000 and Megan wants to spread the depreciation over five years, which of the following will the first year most likely be?</p>
<p>A. $5,000<br />
B. $8,000<br />
C. $10,000<br />
D. $15,000</p>
<input type="button" value="Click to see answer" onClick='alert("D. $15,000 -- If Megan was asked to use straight line depreciation, then the answer would be $10,000, which is a simple average. For accelerated depreciation, the first year will be higher than the average and incrementally decrease over time. As a result, the first year depreciation could only be $15,000 from this list since it is the only value greater than $10,000.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-517"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/accelerated-depreciation/feed</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Net present value (NPV)</title>
		<link>http://pmtestcenter.com/net-present-value-npv?utm_source=rss&#038;utm_medium=rss&#038;utm_campaign=net-present-value-npv</link>
		<comments>http://pmtestcenter.com/net-present-value-npv#comments</comments>
		<pubDate>Fri, 16 Dec 2011 05:01:16 +0000</pubDate>
		<dc:creator>Gabe Young</dc:creator>
				<category><![CDATA[cost]]></category>
		<category><![CDATA[initiating]]></category>
		<category><![CDATA[project selection]]></category>

		<guid isPermaLink="false">http://pmtestcenter.com/?p=509</guid>
		<description><![CDATA[While determining which project to pursue, your management decides to use net present value (NPV) as the key criteria. If the NPV for Project X is 12,000 and the NPV for Project Y is 15,000, which project should be chosen?

A. Project X
B. Project Y
C. Either can be chosen since the numbers are so close
D. NPV cannot be used to chose projects

Answer: B. Project Y
The net present value (NPV) is basically the value of total benefits minus the costs. It is can be used to determine which project to embark on. If you are comparing project using NPV, the higher the value, the better.]]></description>
			<content:encoded><![CDATA[<!-- Start Shareaholic LikeButtonSetTop Automatic --><!-- End Shareaholic LikeButtonSetTop Automatic --><p>While determining which project to pursue, your management decides to use net present value (NPV) as the key criteria. If the NPV for Project X is 12,000 and the NPV for Project Y is 15,000, which project should be chosen?</p>
<p>A. Project X<br />
B. Project Y<br />
C. Either can be chosen since the numbers are so close<br />
D. NPV cannot be used to chose projects</p>
<input type="button" value="Click to see answer" onClick='alert("B. Project Y -- The net present value (NPV) is basically the value of total benefits minus the costs. It is can be used to determine which project to embark on. If you are comparing project using NPV, the higher the value, the better.")'>
<p><i>If you are reading this via email, please <a href="http://pmtestcenter.com" target="_blank">click here for the answer</a>.</i></p>
<div class="shr-publisher-509"></div><!-- Start Shareaholic LikeButtonSetBottom Automatic --><!-- End Shareaholic LikeButtonSetBottom Automatic -->]]></content:encoded>
			<wfw:commentRss>http://pmtestcenter.com/net-present-value-npv/feed</wfw:commentRss>
		<slash:comments>1</slash:comments>
		</item>
	</channel>
</rss>